Saturday, December 5, 2020
Converting Tree Dazzler lights for portable use,
Wednesday, October 21, 2020
Basic mead
12 pounds raw honey (wildflower preferred)
4 gallons of filtered spring or distilled water (NOT tap!)
1 packet champaine yeast
5 gallon carboy with air lock
cool (but not cold) place out of the sun (no ultraviolet), basments work well, closets will work too.
Using a large pot, warm the water on the stove and mix in the honey until it is a thin syrup, do not boil. Do this in batches and transfer each batch to the carboy, until all the honey is used and the carboy is full. Use care when transfering, you may need to allow the syrup to cool.
Activate yeast as per package directions and add to carboy after the syrup has cooled. Stopper the carboy with the air lock and place in a cool dark place. Check in a day to ensure that the yeast is alive (lock is bubbling) and wait for it to stop. Adding yeast food will help start a stalled batch, either at the beginning or later when it begins to slow. The longer it is alive, the higher the alcohol by volume.
Some things to add for future batches, fruits (citrus peels, apples, plums), herbs (lavender, rose petals, herbal teas), or spices (pumpkin spice, peppers).
Tuesday, September 3, 2013
Vinyl graphics, part 1
A roll of vinyl in loaded into the machine which connects to a computer very much like a printer or a plotter. The software sends the vector designs to the cutter which begins cutting. After the machine cuts the vinyl you have a sheet with barely visible cuts on it. Beginning at the outside, we begin weeding and you can begin to see the design.
And here's the finished banner reading for the backing. The backing covers the design and is used for transferring the vinyl from the paper to it's destination. On the right are a couple of smaller pieces with the backer on them.
And those smaller pieces in place. I picked up a kindle, cheap, and it reminded me of the hitchhiker guide, so it needed "Don't Panic!" in large friendly letters on it. The other was for the kayak, which I have named the "Wetware" (it's a computer term). There is more that will be going on the kayak later.
It will probably be a couple days before we can get the rest cut and put on the trailer.












